5-AXISROBOTICS
Reducing Setups on a Multi-Face Housing
A revised datum strategy reduced repositioning and improved interface consistency.
View details →PRODUCTION EXAMPLES
SELECTED PROJECTS
5-AXISA revised datum strategy reduced repositioning and improved interface consistency.
View details →
THERMALProtected interfaces and anodizing requirements were built into the route.
View details →
TURNINGTool control and gauging stabilized concentric features across batches.
View details →
PROTOTYPEMachining enabled design validation before molded production tooling.
View details →
MILLINGAn approved sample and inspection plan supported repeat orders.
View details →
FABRICATIONSheet metal and CNC operations were coordinated under one drawing package.
View details →